1. ISO14001 project implementation plan Welcome to inquire: Miss Luo 13798904733
2. Appoint the project leader (or environmental manager representative)
3. Determine the organizational structure and department responsibilities of environmental management
4. Established ISO14001 system implementation team
5. Operation flow chart and process flow chart of each department
6. Draw the layout of the factory floor plan
7. Draw fire equipment configuration diagram and emergency escape diagram
8. Draw the pipe network diagram of domestic wastewater/industrial wastewater/industrial waste gas discharge
9. Environmental system standard training, environmental factor identification training
10. Each department identifies its environmental factors according to the process/flow diagram
11. Identify important environmental factors of the company
12. Collect Material Safety Data Sheets (MSDS) from chemical suppliers
13. Collection and sorting of environmental protection laws and regulations and customer requirements
14. Evaluate the applicability of environmental regulations and other requirements and environmental factors
15. Determine the environmental policy
16. External (related parties) publicity of the environmental policy
17. Internal (employees of various departments) publicity of environmental policy
18. Sign environmental agreements with suppliers/recyclers/contractors and other related parties
19. Write an environmental manual
20. Write environment program files
21. Prepare relevant operation control guidance documents for each department
22. Write an environmental record form
23. Release and operation of environment system files
24. Learning environmental factors and list of important environmental factors
25. Statistics on the consumption of water, electricity, paper and other resources and energy in the last six months (to provide information for the subsequent formulation of environmental target indicators)
26. The formulation of environmental target indicators management plan
27. Plan environmental monitoring and contact the monitoring unit
28. Implement environmental monitoring (wastewater/waste gas/plant boundary noise)
29. Training and implementation of garbage classification methods
30. Internal hazardous waste handover record
31. Planning and implementation of fire drill programs;
32. Management of fire protection facilities;
33. Planning and implementation of chemical leakage drills (enterprises that do not use hazardous chemicals do not have to do so)
34. Formulation of other necessary emergency measures other than fire emergency
35. Management of chemical warehouses
36. Collect qualification documents for personnel in special positions (such as electricians, welders, elevator operators, boiler operators, crane operators, etc.)
37. Consumption management of water, electricity, paper, raw materials, oil and other resources and energy
38. The marketing department identifies and collects customer environmental protection requirements (such as RoHS, REACH, etc.)
39. The purchasing department exerts environmental impact on suppliers (such as signing an environmental protection agreement or requiring the provision of necessary environmental protection testing reports)
40. Evidence collection of environmental system implementation and operation
41. Collection of key regulatory documents: such as construction project environmental impact assessment (form) and approval; environmental protection facility acceptance report
42. Certificate of Environmental Conservation Law in the last year (small polluting enterprises may not provide it)
43. Collect opinions on acceptance of fire protection facilities
44. Collection of pollutant discharge permits (especially required by enterprises that discharge industrial wastewater)
45. Permit for the use of highly toxic substances (only required by companies that use highly toxic substances)
46. Lightning protection facility inspection certificate
47. Qualification documents of hazardous waste recyclers (such as: hazardous waste business license, hazardous waste road transport license, etc.)
48. Disposal agreements/contracts signed by the company and hazardous waste disposers
49. Evidence of Hazardous Waste Treatment: Hazardous Waste Treatment Transfer Form
50. ISO14001 Internal Auditor Training
51. ISO14001 internal audit and inspection records
52. Rectification materials that do not conform to internal audit
53. Management review and rectification data
54. Training on matters needing attention
55. The first stage audit of the certification company (pre-audit)
56. The first stage audit does not meet the rectification
57. The second-stage audit of the certification company (positive review)
58. The second stage audit does not meet the rectification
59. Enterprises obtain certification
60. Follow-up operation and maintenance data of the system