(1) Signing a contract
1. Confirm the status of the factory: confirm the factory inspection items and the overall status of the factory
2. Determine the coaching time and project cycle: According to the situation of the factory, determine the approximate time and the entire cycle of the service required
3. Contract signing: After reaching the cooperation matters, both parties sign an agreement
4. Arrange consultants: According to the factory inspection project, the project team will arrange consultants in a targeted manner
(2) Consultation preparation
1. Determine the goal: the teacher goes to the factory to further determine the goal that the factory needs to achieve (according to the contract)
2. Establish an implementation committee: the consultant and the relevant personnel of the factory set up an implementation committee together
3. Configuration of relevant personnel and equipment: make corresponding work arrangements for the factory personnel who cooperate with the implementation
4. Implementation of work preparation: relevant personnel confirm their own work
(3) Scheme design
1. Information integration: Integrate all relevant information of the factory to ensure that the current status of the factory is clear
2. Document preparation: according to the situation of the factory itself, prepare relevant documents
3. Identification of key factors: identify and control the key control points of the factory inspection
4. Scheme design: design the most reasonable and cost-optimized scheme according to the factory conditions
5. Rectification suggestions: Design corresponding effective rectification measures for the plan
(4) Basic training
1. Concept training: organize the members of the implementation committee and relevant leaders to conduct concept training
2. Standard understanding: effective understanding of the standards related to the factory inspection
3. Relevant staff training: effective work arrangement and training for members of the implementation committee
(5) Implementation and promotion
1. Full implementation: members of the implementation committee start work according to their own requirements
2. Progress implementation: consultants effectively control the progress of rectification to ensure completion on time
3. Applicability revision: Appropriate revisions are made according to the problems that arise during the implementation process
4. Special training: For each control point in the project implementation, organize special training
5. Scheme optimization: further optimize the implementation process when encountering points that can be re-optimized
(6) Simulation evaluation
1. Mock audit: After fully implementing the complete modification project, conduct a mock audit
2. Continuous improvement: continuous improvement of the problems found
3. On-site layout: make effective on-site layout before or on the day of the factory inspection
(7) Review response
1. Accompanying the factory inspection: the consultant will be accompanied on the day of the audit, and the progress of the factory inspection will be followed up throughout the process.
2. Emergency treatment: Effectively deal with unexpected situations that occurred on the day of the factory inspection
(8) Continuous follow-up
1. Follow-up report: communicate with the audit company and assist the factory to obtain the report as soon as possible
2. Continuous improvement: continuous improvement of the problems found